TAKE NOTICE that Development is proposed for the Demolition of an existing burned-out house and Construction of 1 no. 5 bedroom dwelling house with new tertiary treatment system and infiltration / treatment area, including all other ancillary site works and services. The existing site access with setback will be used along with the existing connection to public watermain.
In accordance with Article 120(1)(b)(i) of the Planning and Development Regulations 2001 (as amended) Donegal County Council has concluded, based on a preliminary examination of the nature, size, and location of the development, that an Environmental Impact Assessment (EIA) is not required.
Plans and particulars of the proposed development will be available for inspection (or purchase at a fee not exceeding the reasonable cost of making a copy) in the below Council buildings.
The Planning Office, Donegal County Council, County House, The Diamond, Lifford, Co. Donegal, F93 Y622.
From Wednesday 25th September to Wednesday 23rd October 2024
Submissions or observations with respect to the proposed development, may be made in writing to ThePlanning Office, Donegal County Council, County House, Lifford, County Donegal, F93 Y622, or by Online: Via the Council’s consultation portal https://consult.donegal.ie/en/browseon or before 4.30pm on Wednesday 06th November 2024. Please mark the front of the envelope with the project name per the above schedule.
Specific Instance (SI) Dwelling including all other ancillary site works and services at Trentaghmuckla, St Johnston, Co Donegal
Part 8 Planning Notice
Trentaghmucklagh, St Johnston,
Co Donegal
TAKE NOTICE that Development is proposed for the Demolition of an existing burned-out house and Construction of 1 no. 5 bedroom dwelling house with new tertiary treatment system and infiltration / treatment area, including all other ancillary site works and services. The existing site access with setback will be used along with the existing connection to public watermain.
In accordance with Article 120(1)(b)(i) of the Planning and Development Regulations 2001 (as amended) Donegal County Council has concluded, based on a preliminary examination of the nature, size, and location of the development, that an Environmental Impact Assessment (EIA) is not required.
Plans and particulars of the proposed development will be available for inspection (or purchase at a fee not exceeding the reasonable cost of making a copy) in the below Council buildings.
From Wednesday 25th September to Wednesday 23rd October 2024
Submissions or observations with respect to the proposed development, may be made in writing to The Planning Office, Donegal County Council, County House, Lifford, County Donegal, F93 Y622, or by Online: Via the Council’s consultation portal https://consult.donegal.ie/en/browse on or before 4.30pm on Wednesday 06th November 2024. Please mark the front of the envelope with the project name per the above schedule.
Roinn
Téamaí
Ábhair